How Many Man Hours Does It Take to Build a Deck?

Building a deck is a great way to enhance outdoor living spaces, adding both value and functionality to a property. However, one of the most common questions homeowners ask before starting a deck construction project is: how many man-hours does it take to build a deck? The answer depends on various factors, including the size of the deck, materials used, design complexity, weather conditions, and the experience level of the builders.

If you’re in Hagerman and looking for professional help, hiring the Best Deck Building Contractor in Hagerman can save you time and ensure a high-quality result. In this article, we’ll explore how long it takes to build a deck, breaking down the different factors that affect the timeline and labor involved.

Factors Affecting Man-Hours for Deck Construction

1. Deck Size

The most significant factor affecting man-hours is the size of the deck. A small, basic deck (10×10 feet) may take significantly less time compared to a large, multi-level deck with intricate designs.

  • Small Deck (100-200 sq. ft.) – 40 to 60 man-hours
  • Medium Deck (200-400 sq. ft.) – 80 to 120 man-hours
  • Large Deck (400+ sq. ft.) – 150+ man-hours

2. Deck Material

The choice of decking material also impacts labor time. Some materials require more effort to install than others.

  • Pressure-treated wood – Easiest to work with, moderate installation time
  • Composite decking – Requires precise cutting and additional framing, increasing installation time
  • Hardwood (e.g., Ipe, Cedar) – More challenging to cut and fasten, adding extra labor hours

3. Deck Design and Complexity

Simple, rectangular decks take much less time to build than multi-level or custom-shaped decks. Adding railings, stairs, pergolas, and built-in seating can increase man-hours considerably.

  • Basic design – Faster construction
  • Custom features (curves, multi-levels, benches, lighting) – Increased time requirement

4. Foundation and Site Preparation

The condition of the construction site can significantly affect man-hours. A flat, clear area requires minimal preparation, whereas sloped or uneven terrain may require excavation, leveling, or additional support structures.

5. Weather Conditions

Weather plays a crucial role in deck building. Rain, snow, or extreme heat can delay construction and add additional labor hours.

6. Number of Workers

The more workers involved in the project, the faster the deck can be completed. For instance:

  • 1-2 workers – Slower progress, potentially doubling man-hours
  • 3-4 workers – Balanced efficiency and precision
  • 5+ workers – Fast completion, but potential for overcrowding and reduced efficiency

Estimated Man-Hours for Different Deck Types

Deck Type Estimated Man-Hours
Basic 10×10 ft. Deck 40-60 hours
12×16 ft. Deck with Stairs 80-100 hours
16×20 ft. Multi-Level Deck 120-160 hours
Large Custom Deck with Features 200+ hours

DIY vs. Hiring the Best Deck Building Contractor in Hagerman

DIY Deck Construction

If you’re an experienced DIYer, you can save on labor costs but should expect the project to take longer. A basic deck that professionals build in 60 hours may take a DIYer 100-120 hours.

Hiring a Professional

Working with the Best Deck Building Contractor in Hagerman ensures efficiency, quality, and compliance with local building codes. Professionals have the tools, experience, and manpower to complete the project within a reasonable timeframe.

Steps in Deck Construction and Estimated Time

1. Planning and Permitting (10-20 hours)

  • Design and layout
  • Obtaining permits
  • Ordering materials

2. Site Preparation (5-15 hours)

  • Clearing and leveling the ground
  • Marking the layout

3. Foundation and Framing (20-50 hours)

  • Installing footings
  • Building the frame

4. Decking Installation (20-40 hours)

  • Installing boards
  • Fastening with screws/nails

5. Railing and Stairs (10-30 hours)

  • Measuring and cutting rails
  • Installing stairs

6. Finishing Touches (10-20 hours)

  • Sanding and staining
  • Adding built-in features

10 FAQs About Deck Building

1. How long does it take to build a deck from start to finish?

It depends on the deck size and complexity, but typically 1-3 weeks.

2. How much does labor cost for deck building?

Labor costs vary but generally range between $15-$35 per square foot.

3. What is the most durable decking material?

Composite and hardwoods like Ipe are highly durable.

4. Do I need a permit to build a deck in Hagerman?

Yes, most decks require a permit. Always check with local authorities.

5. How many people are needed to build a deck?

A team of 2-4 professionals is optimal for efficient construction.

6. What is the best season to build a deck?

Spring and early summer are ideal, but decks can be built year-round depending on weather.

7. Can I build a deck myself?

Yes, but it requires time, tools, and construction knowledge.

8. What’s the best way to maintain a deck?

Regular cleaning, sealing, and inspections help extend its lifespan.

9. What’s the lifespan of a deck?

Wood decks last 10-20 years, while composite decks can last 25-30 years.

10. Why should I hire a professional contractor?

A professional ensures proper installation, compliance with codes, and a high-quality finish.

Conclusion

The time required to build a deck depends on size, material, design, and labor efficiency. While DIY deck building can be rewarding, hiring the Best Deck Building Contractor in Hagerman ensures faster and more reliable results. If you’re considering a deck project, reach out to an experienced contractor to get started today!

Leave A Comment

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare